The proof after release.
+ The questionWhat has to keep happening for a test that was proven once to stay proven while people rely on its results?
Suppliers, controlled in proportion to risk
On 27 July 2026 the FDA received notice of a change to a blood test for colorectal cancer that it had approved three days earlier. The test's maker reported changes in a supplier's manufacturing processes for critical reagents, using a 30-day notice, the route that Chapter 25 describes for changes to an approved device's manufacturing methods. The FDA recorded the notice as a process change at a supplier, not as a change to the test's design, and accepted it on 26 August 2026, 30 days after receiving it. Yet the studies behind the approval had used reagents from the supplier's earlier process, and kits made after the change could carry reagents from the new one.
Chapter 19 set out how a test is proven against a claim, with traced requirements, a locked pipeline and analytical studies, and the proof describes the test as it stood when the studies ran. After release the test's inputs keep changing. Suppliers change their reagents and software, the maker changes its own design, and laboratories and clinicians report complaints and wrong results that no validation study saw. Since 2 February 2026 the FDA has inspected device makers under a compliance program that names the parts of a quality system that deal with these changes. Among them are outsourcing and purchasing, complaint handling, corrective action, preventive action, and product and process changes. Together they form a loop that runs for as long as the test is in use. These duties fall on the maker of a device, and Chapter 25 shows how a US laboratory's own test reaches patients under CLIA instead.
An omics test is assembled largely from other makers' products. Its tubes and preparation kits, its instrument and primary software, and the tools of its pipeline come from different makers, the owners that Chapter 17 named. A maker that sells the test as a device buys many of these parts, and each company it buys from is a supplier. Work that an outside party does for the maker is what ISO 13485 calls an outsourced process. The standard, which the QMSR incorporates, requires the control of both to be proportionate to risk, and FDA's training on the regulation reproduces its words. The criteria for evaluating and selecting suppliers must be "proportionate to the risk associated with the medical device", and the controls over an outsourced process "proportionate to the risk involved and ability of external party to meet requirements".
The same rule of proportion applies after the purchase. In the standard's words as the FDA reproduces them, the extent of verification activities "shall be based on the supplier evaluation results", and a failure to meet purchasing requirements is "addressed with the supplier proportionate to the risk". The QMSR's own text no longer carries a section on purchasing. FDA's comparison of the old and new rules lists the purchasing controls of the old regulation among the requirements now incorporated by reference. The preamble to the final rule states that the QMSR "requires that manufacturers of finished devices apply an ongoing" assessment of their suppliers, informed by risk.
A supplier's change reaches a proven test through faults of the kind Chapter 17 described. There, the rate of index swapping varied between flow cells with the reagents and the flow-cell lots, and one vendor's index plates arrived with cross-contamination between neighboring wells. A supplier that changes how it makes an enzyme or an index plate can move such a rate while every step in the laboratory stays the same. Incoming checks and the test's own controls are then what detect the shift. The evaluation of each supplier sets how closely its products are checked on arrival. Software written outside the maker enters the test in the same way, and Chapter 19 showed that an update to an open-source tool in the pipeline is a change to the test.
A change is reviewed before it reaches patients
Changes also start with the maker. A new reagent formulation, a new instrument model, a new version of the pipeline or a new specimen tube each alters something that the evidence of Chapter 19 measured. FDA's training on the QMSR sets out that ISO 13485 requires such changes to be controlled before they are implemented, which is the change control of Chapter 19. Within that process the change review judges what a change affects, and the training reproduces what clause 7.3.9 of the standard asks of it: the "review of design and development changes shall include evaluation of the effect of the changes on constituent parts". For an omics test those parts include the reagents, the instrument's settings and the pipeline. A change to a library kit is therefore judged by its effect on the quality of the run, on the pipeline's filters and on the calls that reach the report.
The trace of Chapter 19 sizes the work that follows. Because each design input is linked to the outputs that satisfy it and to the studies that proved it, a change can be followed to the inputs it touches, and the studies behind those inputs are run again. A new lot of an enzyme from a supplier that has passed its evaluation may need only a comparison with the previous lot on a reference material. A change to the variant caller means that accuracy and the limit of detection are shown again for every type of variant it calls. For a minor change to the pipeline of a germline sequencing test, FDA's 2018 guidance allows the new pipeline's results to be compared with those of the existing one (Chapter 19). A change that could alter whether the test still meets its intended use, such as a new specimen type, returns the team to validation.
Some changes must also go to whoever assessed the test before it was sold. In the United States, the notice at the opening of this chapter reached the FDA before the supplier's change was made, and Chapter 25 shows a change to another approved blood test, to its classification model, that needed the FDA's approval before it was made. In the European Union a test's assessor is its notified body, a conformity assessment body designated under the In Vitro Diagnostic Regulation, or IVDR, and Chapter 26 sets out which tests need one. Annex IX of the IVDR obliges a maker to tell its notified body in advance about substantial changes it plans to make to its quality system or its range of devices. In the annex's words the maker "shall inform the notified body", and the body records its approval as a supplement to the certificate. When the notified body has assessed a device's technical documentation, changes need that body's approval "where such changes could affect the safety and performance of the device", and the approval again takes the form of a supplement to the certificate. The same annex requires the notified body to audit each maker without notice at least once every five years.
India's Medical Devices Rules, 2017, put the licensing authority's approval before a major change. Under Rule 26(iii) a license holder "shall obtain prior approval" from the central or state licensing authority, whichever applies, "before any major change as specified in the Sixth Schedule". Chapter 27 sets out which authority licenses which test. The authority is to approve or reject the change within 45 days, and without a reply "such change shall be deemed to have been approved". Minor changes, which the same schedule lists, are reported within 30 days, and an import license carries the same duties with 60 days for the authority's answer. CDSCO, the Central Drugs Standard Control Organisation, publishes a compilation of the Rules with their amendments to October 2022, and the wording above is taken from it. CDSCO's addendum of 13 March 2026 to its answers to frequently asked questions about IVDs states that each change to the version of approved software needs an application for a post-approval change.
A complaint opens an investigation
The users of a test report what goes wrong with it as complaints, and each complaint is a possible sign that the evidence no longer holds. For an omics test a complaint may be a laboratory reporting runs that fail their quality thresholds, or a clinician reporting a result that disagreed with another test, with a repeat of the same test or with the patient's course. The QMSR fixes what the maker's record of a complaint must hold. The record gives the device's name, the date the complaint was received, the unique device identifier or other identifiers, the complainant's contact details, and the nature and details of the complaint. It also holds any corrective action and reply, and the records of review and investigation, with a justification when no investigation was done.
FDA's page on mandatory reporting adds that a maker keeps complaint files and procedures "for receiving, reviewing, and evaluating complaints". Complaints that must be reported to the FDA are kept "in a separate portion of the complaint file or otherwise clearly identified". The page is dated 27 March 2025, before the QMSR took effect. Once a complaint is on file, the investigation looks for its cause. The preamble to the QMSR's final rule names clauses 8.2.2, 8.5.2 and 8.3.1 of ISO 13485 as the ones that address investigations of complaints. Clause 8.5.2, on corrective action, covers evaluating "any need for actions to ensure that nonconformities do not recur", where a nonconformity is a failure to meet a requirement, such as a result outside the test's specification.
Clause 8.5.3 adds preventive action, taken on a potential problem before it occurs, such as a weakness found in one lot that may also lie in lots not yet used. FDA's training reproduces how the standard scales both: "Corrective actions shall be proportionate to the effects of the nonconformities encountered", and "Preventive actions shall be proportionate to the effects of the potential problems." The preamble states that the FDA "has incorporated the corrective action and preventive action requirements of ISO 13485 by reference into the QMSR".
The IVDR draws the line between the two kinds of action in another place. It defines corrective action as "action taken to eliminate the cause of a potential or actual non-conformity or other undesirable situation", so its term also covers the potential problems that ISO 13485 places under preventive action. A maker that works under both therefore maps its procedures to both sets of words. The IVDR's terms for action in the field, the subject of this chapter's last section, are built on its definition of corrective action.
For an omics test a corrective action can be a change: an acceptance test for incoming lots, a tighter threshold for run quality, a revised filter in the pipeline, or a new line among the report's limitations. Each then passes through change control, with the change review of the previous section and the re-verification that the review calls for.
The risk documents of Chapter 19 are updated with what the investigation found, such as a hazard that the risk analysis had not listed or a probability that it had set too low. ISO 14971 places this work in its clause on production and post-production activities. A 2022 summary by the Johner Institute, the regulatory consultancy of Chapter 19, describes that clause as asking the maker to collect information from the installation, use and maintenance of the device, among other sources, and to review it for hazards not previously considered and for risks that were wrongly estimated or are no longer acceptable. The investigation also settles two further questions, whether the event must be reported to a regulator and whether tests already in use need action, and the next two sections take them in turn. The changed test then returns to use.
Harm through a decision, and the clocks for reporting it
A diagnostic test harms in a way that an implant or a pump does not. It acts only on a specimen already taken, so a wrong result injures no one directly, and the harm comes through what a clinician or a patient decides on the result (Chapter 19). FDA's guidance on reporting and the IVDR's definitions both name that path, and each of the three jurisdictions sets its own clocks. Each clock for reporting an event starts on a day set by what the maker has learned, whether or not the investigation has yet found a cause.
In the United States the Medical Device Reporting regulation, 21 CFR Part 803, sets out who reports what to whom. A maker reports deaths, serious injuries and malfunctions to the FDA within 30 calendar days of becoming aware of an event. The limit is 5 work days when the FDA designates the event, or when the event "requires remedial action to prevent an unreasonable risk of substantial harm to the public health". An importer reports deaths and serious injuries to the FDA and to the maker, and malfunctions to the maker only, within 30 calendar days. FDA's page lists user facilities as hospitals, ambulatory surgical facilities, nursing homes and outpatient diagnostic or treatment facilities. A user facility reports a death to the FDA and the maker, and a serious injury to the maker, within 10 work days.
The FDA explains the words that start these clocks in its final guidance on reporting by manufacturers, issued on 8 November 2016 and not withdrawn as of October 2026. For a 30-day report, and for a 5-day report that the FDA has requested, a maker becomes aware when any of its employees becomes aware of information that "reasonably suggests that an event is required to be reported", so that clock starts on the day the first employee learns of such information. A 5-day report on an event that needs remedial action has its own starting day. For that report the maker becomes aware when an employee in a particular role learns, from any information including a trend analysis, that the action is needed. That day can come later than the day the first employee heard of the event.
The guidance describes that role in a single clause. It names an employee "with management or supervisory responsibilities over persons with regulatory, scientific or technical responsibilities", and the clause goes on "or whose duties relate to the collection and reporting of adverse events". The wording does not settle whether those duties belong to the employee or to the persons supervised, and the regulation's own definition could not be read for this guide. On the first reading, the clock starts when either a supervisor or an employee who handles adverse events learns that the action is needed. On the second, it starts only when a supervisor does.
A malfunction is "the failure of a device to meet its performance specifications or otherwise perform as intended", and FDA's guidance adds that "Performance specifications include all claims made in the labeling for the device." For a test the guidance is direct: "we consider the failure of a diagnostic device to be reportable when it indirectly causes or contributes to, or is a factor in, a death or serious injury, or would be likely to, if the failure were to recur."
The IVDR names harm through a decision in its definitions. An incident is "any malfunction or deterioration in the characteristics or performance of a device made available on the market". The definition includes use error due to ergonomic features and any inadequacy in the information the maker supplies, and it also includes "any harm as a consequence of a medical decision, action taken or not taken on the basis of information or result(s) provided by the device". A serious incident is one that "directly or indirectly led, might have led or might lead to" a death, a temporary or permanent serious deterioration in a person's state of health, or a serious public health threat. Harm that follows when a clinician withholds treatment on a wrong result is therefore an incident in the regulation's own words, and a serious incident when that decision led, might have led or might lead to a death or a serious deterioration in health.
Article 82 sets the clocks for serious incidents. Makers report a serious incident "immediately after they have established" a causal relationship with the device, or that such a relationship is reasonably possible, and "not later than 15 days after they become aware of the incident". The limit is 10 days for a death or an unanticipated serious deterioration in a person's state of health, and 2 days for a serious public health threat. One exception is particular to tests: "expected erroneous results which are clearly documented and quantified in the product information" are left out of these reports. On that wording, the performance figures in a test's instructions also separate the wrong results that the maker reports one by one from those it counts in trends.
Trend reporting, under Article 83, covers non-serious incidents and expected erroneous results together. The Medical Device Coordination Group, whose guidance documents interpret the regulation, describes the duty in guidance of December 2025, which is not legally binding. The guidance asks the maker to watch these events for a "statistically significant increase in the frequency or severity" that could significantly affect the balance of benefit and risk, and to define the methods, thresholds and observation period in its surveillance plan. After a serious incident, Article 84 requires the maker to "perform the necessary investigations" without delay, including a risk assessment of the incident and of any corrective action taken in the field, which the last section of this chapter describes. The maker cooperates with the competent authorities, the member states' regulators, which evaluate the risks themselves.
A malfunction that injured no one is reportable to the FDA when it "would be likely to cause or contribute to a death or serious injury if the malfunction were to recur", and FDA's guidance applies the same test to a diagnostic device that fails. The IVDR counts as serious an incident that "might have led or might lead to" a death or a serious deterioration in health. A false-negative call caught on a repeat test before anyone acted on it can therefore still need a report in both jurisdictions. The EU's exception is an expected erroneous result of the kind that the product information documents and quantifies, which goes to trend reporting instead.
India's Rules use one phrase for every kind of device. Under Rule 26(ii) the license holder informs the state or central licensing authority, whichever applies, "of the occurrence of any suspected unexpected serious adverse event and action taken thereon including any recall". It must do so "within fifteen days of such event coming to the notice of licence holder". Unlike the IVDR's definition of an incident, the words name no path to harm through a result. A newspaper, a law firm and a compliance-software firm reported in May and June 2024 that a CDSCO circular of 15 May 2024 addressed license holders on reporting adverse events from their devices through the Materiovigilance Programme of India, MvPI, the national program that collects reports of adverse events from medical devices. The three summaries differ on whether the circular requires such reports or urges them, and on whether it covers all adverse events or only suspected unexpected serious ones. None gives a time limit or a form or says whether the circular names IVDs, and the circular itself could not be read for this guide.
Under the rules as of October 2026, a maker that sells a sequencing test in the United States, the EU and India counts its limits for reporting a death after a false-negative result in calendar days from day 0, the day it learns of the death. Article 82 of the IVDR counts its limits in days after the maker becomes aware, and a regulatory consultancy's guide counts them in calendar days with the day of awareness as day 0. The EU's general rule on time limits, a Council regulation of 1971, counts the same way: it leaves out the day of the event and counts Saturdays, Sundays and public holidays. The IVDR's 10 days for a death therefore end on day 10. India's 15 days end on day 15, if the death counts as a suspected unexpected serious adverse event. The FDA's 30 calendar days end on day 30. If remedial action is needed to prevent an unreasonable risk of substantial harm, the FDA's limit is 5 work days instead, counted from the day the maker becomes aware that the action is needed, here taken as day 0. The FDA counts work days Monday through Friday except federal holidays, so with no holiday 5 work days from any weekday span one weekend and end on day 7, and each federal holiday within the span adds one more work day to count. Without remedial action, the IVDR's day 10 is therefore the working deadline, 20 days before the FDA's. With it, the FDA's day 7 comes first, 3 days before the IVDR's. Day 10 falls on a Saturday or a Sunday when day 0 is a Wednesday or a Thursday, and the EU's general rule moves the end of a period that falls on such a day, or on a public holiday, to the next working day. No source read for this guide says whether the general rule governs these reports, so the example keeps day 10, the earlier of the two possible end days.
Field actions, and follow-up for the test's whole life
When an investigation shows that tests already in use put patients at risk, the maker acts on them where they are. In the United States, 21 CFR Part 806 governs two kinds of action. A correction is the repair, modification, adjustment, relabeling, destruction or inspection of a device, including patient monitoring, without moving it, and a removal moves the device from its point of use. A maker or importer reports a correction or removal to the FDA when it is made to reduce a risk to health posed by the device, or to remedy a violation of the law that may present a risk to health. The report is due "within 10-working days of initiating such correction or removal". Improvements that reduce no risk to health, market withdrawals, routine servicing and stock recoveries are exempt from the report.
The maker keeps records of all corrections and removals for 2 years beyond the device's expected life. On these definitions, an update to a cleared test's pipeline made to reduce a risk to health would be a correction. FDA's compliance program of February 2026 ties ISO 13485 to the two US rules. A maker meets clause 8.2.3 of the standard, on reporting to regulators, by notifying the FDA of complaints that meet the criteria of Part 803, and it handles its advisory notices to users "in accordance with the requirements of 21 CFR 806".
On 20 March 2026 Foundation Medicine began to recall 163 units, in three lots, of a sequencing reagent for its FoundationOne CDx test, the profiling test of 324 genes that Chapter 21 describes. FDA's record of the recall gives the reason: the reagent might increase phasing, in the sense of Chapter 16, and so produce false-positive calls of small insertions or deletions at splice sites, the edges of exons, in the BARD1 gene. The company asked the sites that had received the lots to quarantine the units and return them. On 22 April 2026 the FDA classified the action as a Class II recall, a class that belongs to the recall and not to the test, which is a device of the FDA's class III (Chapter 25). As of October 2026 the record gives the cause as under investigation by the firm, and it does not say how BARD1 calls already reported were handled.
The IVDR calls a field action a field safety corrective action, a corrective action that a maker takes "for technical or medical reasons to prevent or reduce the risk" of a serious incident. The message that announces one to users is a field safety notice. A US correction is reported after it starts, while a field safety corrective action is reported "in advance of the field safety corrective action being undertaken", except in urgent cases. Article 84 requires the notice to "explain, in a clear manner, without understating the level of risk", to "clearly indicate all the actions to be taken by users", and to be entered in the regulation's electronic system, "through which that notice shall be accessible to the public." Four modules of EUDAMED, the EU's database for devices, became mandatory on 28 May 2026, and the module for vigilance, the reporting of incidents and field actions, is not among them (Chapter 26).
India's Rules define a recall as "any action taken by its manufacturer or authorised agent or supplier to remove the medical device from the market or to retrieve the medical device from any person to whom it has been supplied". They give three grounds for one: the device is hazardous to health, it fails to conform to a claim its maker made about its quality, safety or efficacy, or it does not meet the requirements of the Act and the Rules. For a test, the second ground ties a recall to the performance its maker claimed. Under Rule 26(vi), when the licensing authority directs it, the license holder withdraws the rest of a lot from sale and recalls the units already issued "so far as practicable".
Field actions deal with one problem at a time, and post-market surveillance watches the test as a whole. India's Rules define post-marketing surveillance as a systematic process for collecting and analyzing information from devices placed on the market. The IVDR builds a system around the same idea in Articles 78 to 81, which the Medical Device Coordination Group's guidance of December 2025 sets out. A maker plans, runs and updates a surveillance system whose plan is part of the test's technical documentation. It prepares a surveillance report for a test in class A or B and a periodic safety update report for one in class C or D, the two higher of the IVDR's four classes of risk (Chapter 26).
Post-market performance follow-up is required under the IVDR to confirm, over the device's expected lifetime, that its safety, performance and clinical evidence remain valid and its balance of benefit and risk acceptable. The coordination group's guidance calls it "a continuous process that updates the performance evaluation", the evaluation of Chapter 26 with its three elements. Data from tests in use therefore return to the evidence that was assessed before sale, and the next change review starts from that updated evidence rather than from the studies of the first release.
Take one complaint about a wrong result from a test in use, or write a realistic one, and follow it to the end. Record it with every field the QMSR lists. Note the day and the employee who first heard of it. If remedial action proves necessary, also note the day a supervisor learned that it was and the day an employee who handles adverse events learned it. The clocks for reporting the event start on these days, and counting the 5-day clock from the earlier of the last two meets either reading of the guidance's wording. Decide within the first days whether it meets the US, EU or Indian criteria for a report, and write down the earliest deadline that applies. Investigate the cause, size the corrective action to the effect of the problem, and pass the fix through change control, reviewing it against the trace of Chapter 19 and rerunning the studies behind every input it touches. Update the risk documents, decide whether tests in the field need a correction or a notice, and check that the event is counted in the next trend analysis.
- A proven test stays proven only while its maker controls its suppliers in proportion to risk, reviews each of its own changes against the trace of Chapter 19 before making it, and, where the rules require it, tells the body that assessed the test before the change is made.
- A complaint opens an investigation, ISO 13485 scales the corrective or preventive action to the effect of the problem, and the fix passes through change control, review and re-verification included, while the investigation's findings update the risk documents.
- A test harms through the decision taken on its result, which FDA's guidance and the IVDR's definition of an incident both cover, and the three jurisdictions set clocks for reporting, from 2 days to 30 calendar days, that start when the maker becomes aware.
- Corrections, removals, field safety corrective actions and recalls act on tests already in use, and the IVDR's post-market performance follow-up returns field data to the performance evaluation for the test's whole lifetime.
Let's Talk