30 — India

Rules after Jaipur.

+ The questionHow do India's regulators tie the standards to their rules, and what changed after the Jaipur depot fire of 2009?

A valve that no one could close

On the evening of 29 October 2009 petrol leaked from the valve of a tank at Indian Oil's depot at Jaipur and formed a cloud of vapor. A spark from an unknown source ignited the cloud, and the cloud exploded. The explosion set fire to all 11 of the depot's tanks, and the fires had burned out by the morning of 11 November. In all, 11 people died, six of them employees of Indian Oil, and seven were seriously injured, as the Ministry of Petroleum and Natural Gas told Parliament.

In February 2010 a newspaper reported the findings of the committee that investigated the fire. By its account, the petrol had leaked for about 1 hour 20 minutes before it caught fire, and the staff at the site could not close the tank's valve because the vapor overcame them. In the same account, the other way of stopping the leak was a switch in the control room for a remote valve on the tank, and that switch had been "non-functional since 2003", although an audit by the Oil Industry Safety Directorate, or OISD, had asked that year for its repair.

Both ways of stopping the leak were lost, and neither loss was of the random kind that a failure rate describes. Closing the valve by hand meant working inside the hazard that the valve was meant to end, so the leak that made the demand also defeated the response. In Chapter 7's terms, a response that the initiating event itself affects is no independent protection layer. Whatever first stopped the switch, its loss was not hidden: it had been known for about six years, as the sticking of Tank 912's gauge was known before the night of the opening story (Chapter 20). A known failure left in place is a fault in how a plant is run, a systematic failure in Chapter 3's sense.

67 — Two ways to stop the leak at Jaipur
PETROL STORAGE TANK PETROL VAPOR REMOTE VALVE TANK VALVE CONTROL ROOM FROM THE CONTROL ROOM SWITCH NON-FUNCTIONAL SINCE 2003 an OISD audit that year asked for its repair LEAKING FOR ABOUT 1 h 20 min BEFORE IT CAUGHT FIRE BY HAND AT THE VALVE THE VAPOR OVERCAME THE STAFF the hazard stands between the person and the valve Schematic, not to scale. Sequence as a newspaper reported the inquiry committee's findings, 3 February 2010.
Dangerous failureOperator and alarmFocal detail
Plate 67 — Both ways of stopping the leak at Jaipur were lost before the fire, by a newspaper's account of the inquiry. The vapor that was the hazard kept the staff from the tank's valve, and the switch in the control room for a remote valve on the tank had been non-functional since 2003, although an audit that year had asked for its repair.

M. B. Lal, a former chairman and managing director of Hindustan Petroleum Corporation Limited, headed the committee. By the newspaper's account, OISD's executive director was among the members. The same account gives three root causes: an insufficient understanding of the hazards and risks, the "absence of leak-stopping devices from a remote location" and the "absence of site-specific written operating procedures". In Chapter 17's lifecycle, the three causes fall at three of its steps, in that order: the hazard analysis, the safety functions specified from it, and the procedures that carry the design's assumptions to the people who run the plant (Chapter 20). Each is a fault in how the depot was designed and run.

The immediate cause of the fire was "non-observance of the normal safety procedures, which involve a sequence of valve operation in the lineup activity", in the words the Ministry gave Parliament in November 2011. Lining up sets each valve on the petrol's route, in a fixed order, before the product moves. The committee found "lapses at operator, supervisory and management levels" and recommended "numerous short-term as well as long-term measures". The Ministry accepted the recommendations and advised the oil marketing companies to carry them out within a time frame. A Joint Implementation Committee was monitoring that work.

A standard binds when a statute includes it

An OISD standard binds a company where a statute includes it. OISD describes itself as a technical directorate under the Ministry of Petroleum and Natural Gas that formulates and coordinates "self regulatory measures". In April 2020 OISD told the Petroleum and Natural Gas Regulatory Board, PNGRB, that 10 of the 60 OISD standards relevant to refineries and gas plants "are mandatory in nature by dint of their inclusion in various statutes like the Petroleum Rules, 2002". The other statutes it named were the rules of 2016 for pressure vessels and the Oil Mines Regulations, 2017. One of the ten was OISD-STD-118, on layouts for oil and gas installations; the other 50 were not among those the statutes include.

The Petroleum and Explosives Safety Organisation, PESO, was formerly the Department of Explosives. It administers the Explosives Act, 1884 and the Petroleum Act, 1934 and the rules made under them, and it licenses petroleum storage tanks under the Petroleum Rules. An OISD standard that those Rules include therefore reaches a depot through the rules under which the depot's tanks are licensed, as law rather than as advice.

PNGRB makes technical rules of its own. Its regulations of 11 November 2020 set technical standards and specifications, including safety standards, for petroleum installations, and PNGRB has amended them three times, most recently on 17 August 2026. The amendment of 2026 adds requirements for fire and emergency response at large installations and clusters of them. It came into force on its publication on 19 August, with compliance phased in over two to five years by size. The response must come "immediately but not later than 30 minutes", and the fire must be under control within 65 minutes. These requirements belong to Chapter 7's outer rings, which limit what an event does once it has begun.

Workplaces under the new labour code

Workplace law changed on 21 November 2025, when the Occupational Safety, Health and Working Conditions Code, 2020 came into force in full. On that date the Code repealed the Factories Act, 1948, with 12 other labour Acts. The Code keeps the rules, regulations, notifications and orders made under those Acts in force as if they were made under it, so far as they do not contradict it. They stay in force until the Central Government repeals them. The rules written under the Factories Act therefore carried across when the Act was repealed. The Occupational Safety, Health and Working Conditions (Central) Rules, 2026 came into force on 8 May 2026, as a legal publisher reported that month. The labour ministry issued notifications under them in July 2026.

Sites that handle hazardous chemicals answer to environment law as well. The Manufacture, Storage and Import of Hazardous Chemical Rules, the MSIHC Rules, were notified on 27 November 1989 under the Environment (Protection) Act, 1986, and rules on chemical accidents were made in 1996 to supplement them. The environment ministry annexed the Rules, as amended in 1994 and 2000, to an affidavit it gave the National Green Tribunal in January 2025, and described them as putting in place "an operational safety framework in industries dealing with hazardous chemicals". In the same affidavit the ministry named PESO, with the Chief Inspectors of Factories, as the nodal agency for on-site emergency plans and safety reports.

The incubator's class decides who licenses it

For medical devices the binding instrument is the Medical Devices Rules, 2017, which CDSCO administers. The route through them starts from the device's class rather than from an integrity level, and why medicine sets no SIL is Chapter 25's question. The Rules sort devices into classes from A, the lowest, to D. A State Licensing Authority licenses the manufacture of class A and B devices. The Central Licensing Authority licenses the manufacture of class C and D devices and every import. Since a notification of 14 October 2022, non-sterile class A devices that do not measure are exempt from licensing and are registered instead.

Solved example: who licenses the incubator's manufacture in India

CDSCO's classification list for pediatrics and neonatology describes the conventional infant incubator as "designed to provide an enclosed controlled environment to maintain appropriate temperature and humidity levels". The incubator of Chapter 4 encloses the infant and controls the temperature inside, in air mode or in skin mode, so it meets that entry on the enclosure and the temperature. The list puts the entry in class C. The class does not depend on that one match, because the list puts the transport incubator, the open incubator and the infant incubator control unit in class C as well. In class C the incubator goes to the Central Licensing Authority, whether it is made in India or imported. The list puts the incubator warming hood in class A, so a warming hood would go to a State Licensing Authority, or be registered if it is non-sterile and does not measure.

The method under Indian numbers

The Bureau of Indian Standards, BIS, publishes the method's own standards as identical adoptions. An identical adoption is a national standard whose text is the international one, "identical under single numbering", and its number is the IEC's or ISO's with IS in front. BIS lists IS/IEC 61508 Parts 1 to 7 of 2010 and Part 0 of 2005, and IS/IEC 61511 Part 1 under the year 2017 and Parts 2 and 3 of 2016. A function built to IEC 61508:2010 therefore meets the Indian Standard on the same evidence.

For road vehicles, BIS lists Part 12 of ISO 26262 as IS/ISO 26262-12:2018, an identical adoption. ISO 26262 is the method of Chapter 24, and its Part 12 adapts it for motorcycles. AIS-189, one of India's automotive industry standards, covers the approval of vehicles for cybersecurity and of their makers' cybersecurity management systems. It was published in April 2024 and draws "considerable assistance" from UN Regulation No. 155.

AIS-189 governs cybersecurity and cites ISO 26262 as knowledge

AIS-189 deals with a vehicle's electronics and its approval, so it can be taken for India's functional safety rule for vehicles. Its requirements protect the vehicle against attack, while functional safety protects it against its own random and systematic failures. In AIS-189, ISO 26262 appears in a footnote, with ISO/PAS 21448 and ISO/SAE 21434, as an example of what a test agency's staff should know. For functional safety, BIS gives ISO 26262 an Indian number for motorcycles, IS/ISO 26262-12:2018.

PESO appears on two routes: it licenses a depot's tanks, and the environment ministry named it in 2025 for the emergency plans and safety reports of chemical sites.

68 — India's routes by sector, as of November 2026
WHO WRITES THE TECHNICAL TEXT THE RULE THAT CARRIES IT WHO LICENSES OR APPLIES IT FUEL DEPOTS OISD standards self-regulatory measures binding by inclusion in a statute: 10 of 60 (2020) Petroleum Rules, 2002 and other statutes PESO licenses storage tanks PETROLEUM INSTALLATIONS PNGRB PNGRB's safety standards regulations 11 Nov 2020; amended 2023, 2025, 17 Aug 2026 PNGRB WORKPLACES Labour ministry OSH Code, 2020, in force 21 Nov 2025 Central Rules, 2026; Factories Act, 1948 repealed Labour ministry HAZARDOUS CHEMICALS Environment ministry MSIHC Rules, 1989 under the Environment (Protection) Act, 1986 PESO, with the Chief Inspectors of Factories on-site emergency plans, safety reports (2025) MEDICAL DEVICES CDSCO's classification lists Medical Devices Rules, 2017 classes A to D Central Licensing Authority class C and D, all imports the incubator: class C ROAD VEHICLES BIS identical adoption IS/ISO 26262-12:2018 for motorcycles PESO on two routes ACROSS SECTORS: BIS's identical adoptions, IS/IEC 61508 Parts 0 to 7 and IS/IEC 61511 Parts 1 to 3 Schematic. Status as of 18 November 2026; OISD's count as of 30 April 2020.
Focal detail
Plate 68 — India's routes differ by sector in who writes the technical text and who licenses. An OISD standard binds where a statute includes it, 10 of 60 in OISD's count of 2020, and PESO appears on two routes. The incubator, in class C, goes to the Central Licensing Authority.
Find the rule that each standard is tied to

For a fuel depot or terminal in India, list the OISD standards that the Petroleum Rules, 2002 and the other statutes include, and date the list, since OISD's count dates from 2020. Where a person must isolate a hazard at the equipment, check that the person can reach the equipment with the hazard present; if not, specify a final element that acts from a distance, and proof-test it (Chapter 11). Classify a device on CDSCO's list before planning its file, because the class decides the licensing authority. Every drop accounted for, the guide to infusion pumps, follows a pump along the route of the Medical Devices Rules in its Chapter 30. Give every status in the file with its date.

+ What this chapter established
  • At Jaipur on 29 October 2009 both ways of stopping the leak were lost for reasons no failure rate describes: by a newspaper's account of the inquiry, the manual route lay inside the hazard, and the remote switch had been known to be out of order since 2003. After the fire the Ministry accepted the inquiry committee's recommendations, and a Joint Implementation Committee monitored the oil marketing companies' work on them.
  • An OISD standard is a self-regulatory measure until a statute includes it. In OISD's count of 2020, 10 of the 60 relevant to refineries and gas plants were mandatory that way, among them through the Petroleum Rules, 2002, under which PESO licenses storage tanks.
  • Each sector takes its own route. The OSH Code, in force from 21 November 2025, repealed the Factories Act, 1948 and kept the rules made under it in force, so far as they do not contradict the Code, until the Central Government repeals them. The MSIHC Rules rest on environment law, and the incubator, in class C, goes to the Central Licensing Authority.
  • BIS publishes IEC 61508, IEC 61511 and Part 12 of ISO 26262, for motorcycles, as identical adoptions, which a function meets on the same evidence as the international text. AIS-189 deals with a vehicle's electronics and its approval, but it is a cybersecurity standard.

What would have made the night harmless

At about three in the morning the gauge on Tank 912 stopped changing its reading, and the control room went on seeing a tank about two-thirds full. A reading that held still, the story at the front of this guide, ends on what that night does not show: what would have made its failures harmless. Chapter 22 reduced the overflow to two pairs of failures and found that the tank had half the structure the short answer describes. Each of the night's two failures belongs to one half of the fact every chapter rests on, and each half asks something different of the protection.

Every part eventually fails, and the gauge failed often: it had stuck 14 times in the 102 days since its return to service, and none of the stickings reached the depot's defects log (Chapters 20 and 22). Its failure that night was the initiating event, the failure of the control that created the occasion on which the protection had to act (Chapter 22). The three alarms read the gauge's number and were no layer against its failure (Chapter 7). By contrast, a cross-check against a second measurement of the level reveals a reading that holds still during a fill (Chapter 12).

The switch belongs to the second half: some failures stay hidden until the moment the part is needed. After the switch's tests its lever was left down or free to fall, which removed the protection while changing nothing anyone could see (Chapter 11). No failure rate describes the cause, which the regulators who investigated Buncefield placed in the way the switch was designed, installed and maintained, beginning when it was fitted without its padlock (Chapter 3). The answer to such a failure lies in the structure that Chapters 22 and 11 describe: devices whose dominant failures fall to the safe state or are detected, and a test that cannot end with the function disabled, as the pin added after Buncefield makes the lower position unreachable.

How rarely the protection may fail is the half of the question that no single night can show. A night is one demand. A record without failure supports a claim below 1 in 1,000 per demand, at 95 % confidence, only after about 3,000 demands (Chapter 15). The rarity is therefore set before any demand comes, from the risk that would remain without the function (Chapters 6 to 8). The guidance written after Buncefield makes SIL 1 the minimum for every tank in its scope (Chapter 22). The random part of the probability of failure is computed from failure rates and the test interval, and only a count of the failures found in service checks those rates (Chapters 11 and 20).

The same answer holds beyond the tank. The incubator's cutout reads its own sensor and needs no one at the cot side (Chapter 9). Its yearly test reaches the protective channel's hidden failures only by driving that sensor past its limit (Chapter 11). The sectors of Part VI grade the requirements in their own terms but keep the method's steps, and each jurisdiction of Part VIII reaches the standards by its own route.

So a system whose every part can fail still brings itself to a safe state in time when its protection is built for the failure. The protection takes nothing from the part whose failure it answers, falls to the safe state or makes its own failure known, and is tested in a way that leaves it able to act. Its rarity is set from the risk it must remove, and its systematic part is earned in how it is specified, built, tested and kept. Keeping includes repair: Jaipur's remote switch had been known to be out of order since 2003, as a newspaper reported the inquiry's findings. In such a design a gauge whose reading holds still is one of the failures the protection expects, and the protection acts on the level whatever the gauge shows.

Created with Claude (Anthropic).
Educational reference material, not engineering, regulatory or clinical advice. Product and company names referenced are the property of their respective owners.