Integrity for a working life.
+ The questionHow is a safety function kept at its integrity for its whole working life?
Fourteen failures, each cleared and none counted
Between 31 August 2005, when Tank 912 returned to service, and 11 December, its gauge stuck 14 times, and the cause of the sticking was never properly identified. Each sticking was dealt with as it happened: sometimes a supervisor raised the gauge to its highest position and let it settle again, a practice known as stowing, and at other times the maintenance contractor was called in. The Competent Authority found that supervisors logged some stickings as faults and not others, that none reached the depot's defects log, and that the operations manager did not know how often the gauge was failing.
Together the 14 stickings carried a fact that none of them showed alone: how often the gauge failed. Cleared one at a time, they stayed 14 separate problems, not one measure of the gauge, and the contractor's staff did not analyze why they were called out so often. The Competent Authority counts the lack of an effective fault-logging process, and of a maintenance regime that could reliably respond to faults, as two of the most important managerial and organizational root causes. The gauge served the control of the filling, which Chapter 4 keeps apart from the protection, but a safety function's rates are known the same way: only from the failures that someone counts.
Every figure of integrity in the earlier chapters is a prediction made at design. The PFDavg of Chapter 11 assumes a failure rate, a proof-test interval and a test coverage, and a function that is in place and able to act at every moment between tests. The integrity level it is measured against was set from a demand rate that assumes the plant runs as it ran when its risk was analyzed (Chapters 5 and 8). In service each assumption is either kept true by a practice or checked against a record.
A proof test takes the function out of service
Chapter 11 set out what a proof test must reveal. In practice the test is a procedure, carried out on a plant that may still be running. The maker's safety manual for one vibrating-fork level switch, the Rosemount 2130, sets out a comprehensive test for a high-level duty (Chapter 21). The test first inspects the switch for leaks and damage and bypasses the safety function, so that the test does not trip the plant. It then checks the mode setting, raises the product in the vessel until the switch reaches its safe state within the time set, returns the switch to normal and, last, removes the bypass. By the manual, the test "takes several hours to perform with all safety measures being followed", and for those hours the function cannot act.
A quicker partial test in the same manual uses a magnet held to a test point to drive the switch to its safe state within two seconds, and takes less than an hour. It exercises the signal processing and the output, and leaves the sensing fork untested. Some parts cannot be tested at all, because the test would destroy them. Their failures join the uncovered share of Chapter 11, which no test resets and which grows over the whole mission time.
Under IEC 61511-1, proof tests in the process industry are to cover the whole function, from the sensors through the logic solver to the final elements, at the interval that the PFDavg calculation used. Problems that a test finds are repaired, and each test is recorded. A skipped test lengthens the interval: the probability of failure on demand climbs between tests, as Chapter 11 showed, and goes on climbing until the next test that does take place. A test cut short lowers the coverage. Either raises the function's average, just as a less reliable part would.
A bypassed function fails every demand
A bypass is a deliberate means of stopping a safety function from acting while it stays installed, so that a test, a repair or a start-up can go ahead without a trip. PSLG's guidance calls it an override or an inhibit. A bypassed function is in the state that Chapter 11 found in Buncefield's switch with its lever down: it would fail any demand, so its probability of failure on demand is one for as long as the bypass lasts. A demand at a random moment falls inside the bypass with a probability equal to the share of the year spent in it, and that share adds directly to the function's average.
Chapter 11's overfill loop averages about 3.8 in 1,000 when tested once a year, which places it in the SIL 2 band, ending at 1 in 100 (Chapter 8). PSLG states that the loop's figures are fictitious. The room left in that band is 1 in 100 less 3.8 in 1,000, or 6.2 in 1,000, and 6.2 in 1,000 of a year's 8,760 hours is about 54 hours. More than about 54 hours of bypass a year, a little over two days, takes the loop out of the band it sits in, whatever its parts. A sensor channel averaging 3.1 in 10,000 lies in the SIL 3 band, which ends at 1 in 1,000, so its room is about 6.9 in 10,000, or about 6 hours a year. The incubator's channel in Chapter 11 is such a channel before its comparison and cutout add their shares. A bypass adds the same amount to any function, so the hours a function can absorb are set by how far its average lies below the ceiling of its band, and each stricter band's ceiling is 10 times lower. The arithmetic treats a demand as equally likely at every moment. Where the work that needs the bypass can itself cause a demand, its hours weigh more than their share of the year.
In August 2017, at a refinery in the Netherlands, the flow through a furnace stopped while its burners went on firing. The tubes overheated and one ruptured, and more than 100 metric tons of flammable liquid escaped and burned inside the furnace. The low-flow interlock that would have shut off the burner gas was in bypass, set by a field-mounted switch used outside the company's own bypass procedure. No one was hurt, and the unit was out of service for about a year, according to a 2025 case summary from the Center for Chemical Process Safety.
The refinery had two ways to bypass the interlock. Years earlier it had fitted bypass timers, which end a bypass after five minutes, but it had left the field switches in place, and they have no time limit. The operators found five minutes too short, and the field switch gave them a bypass with no limit. The timer built the procedure's time limit into the equipment, and the field switch kept a route around it. Afterwards the site made its untimed switches work only with a supervisor's key. Chapter 11 drew the same distinction with the padlock and the pin: a rule in a procedure holds only while everyone follows it, and the same rule built into the switch holds whether or not anyone follows it.
The specification of Chapter 17 carries the requirements for overrides and bypasses and for how each is cleared. In PSLG's guidance, an overfill function is not to be overridden while the tank is filling, and an override judged necessary comes under management control. PSLG's minimum is nine controls: a management process; a risk assessment that sets measures before the override is applied; a time limit; an authorized signatory; a handover at each change of shift; a time limit for review; a status shown once applied, such as an alarm; an audit; and no override on an output. The 2025 case summary adds one more step: a bypass switch that is no longer needed is removed or locked down.
Overrides on inputs and on outputs differ in where they act. An override on an input stops the logic from acting on one sensor's signal, so a function with more than one sensor can still act on the others. An override on an output holds the final element whatever any sensor says, and removes the whole function. Input overrides are allowed only where justified, and the nine controls give each one a record with a reason, an owner and an end.
A change can move any assumption
A new transmitter may fail at a different rate, a new test may cover less, and new software or configuration may alter what the logic does, so a change can move any assumption that the integrity figure rests on. Management of change, the lifecycle step of Chapter 17, is meant to catch such a move before the change is made. In PSLG's guidance for an overfill function, the review of a change identifies and addresses its safety implications, and the functional safety assessment of Chapter 19 is repeated after any modification. The review spares only a replacement in kind. IEC 61511-1 defines a replacement in kind as an exact duplicate of an element, or an approved substitute that needs no modification of the system as installed, so in service the question is which replacements qualify.
A part that fits the same mounting and does the same job can still change the function, because a different supplier, test position or firmware can alter what the part's figures assumed. The same question, whether a change is only a replacement in kind, arises for valves and instrumentation and equally for software, operating changes, maintenance procedures and purchasing. A substitute is in kind only once approved, and approving it means checking it against the specification and the calculation for any assumption that has moved. That check is a review.
The integrity target itself can move with no change to the function. The enabling conditions that Chapter 5 defines are usually features of how the plant is run, not of its design. PSLG warns that they may fall outside a site's management-of-change process, and change in normal operation without anyone recognizing what that change does to the LOPA. The assumptions about the mode of operation are therefore to be written down, so that their continuing validity can be checked. A depot that comes to spend more of its year filling tanks may have raised the demand rate that set its target, though no instrument has been touched.
Procedures carry the assumptions that no instrument holds. PSLG warns that unless procedures for safety-critical tasks are robust, followed in practice and audited, the human error probabilities of Chapter 9 that a LOPA takes as inputs may no longer hold. For a transfer into a tank, the receiving site's instructions cover the start, monitoring and the response to alarms, a change of tank, the shutdown, routine checks and contingencies. A first verification comes around 15 to 20 minutes into the transfer, a time that depends on the transfer's speed and capacity. Checks at set periods then confirm the operator's picture of the transfer against errors such as a stuck instrument, the failure that held Tank 912's reading still.
Records carry the field back to the design
The rates in a design are checked only by counts from the field. Besides the records that Chapter 11 lists, a site records spurious trips and keeps every record for later analysis, as PSLG asks. Under IEC 61511-1 the user compares the function's actual performance with what the design assumed, and records demands so that the layer of protection that failed can be identified. Chapter 11 showed the interval revised from such records, and the same check applies to every rate in the design.
One site sees few such failures. The transmitter of Chapter 11 has a maker-commissioned rate of 71 FIT for dangerous undetected failures. At that rate one device would show such a failure about once in 1,600 years, and a site with 100 of them about once in 16 years. Counts become useful when many sites pool them.
The 2021 edition of SINTEF's PDS Data Handbook is one such pool. By its publisher's announcement, the handbook draws failure rates, safe failure fractions, diagnostic coverages and proof-test coverages from some 30,000 maintenance notifications and work orders, each classified by equipment experts and operating staff. A pool's records still come from particular plants. A 2021 conference paper by SINTEF and NTNU says where its own records come from: reviews of about 30,000 maintenance notifications for safety instrumented systems in the Norwegian petroleum industry. As the paper's authors state it, IEC 61511 requires reliability data to rest on field feedback from similar devices in a similar environment, and to be credible, traceable, documented and justified.
The loop also runs back to the maker. The safety manual of the 2130 requires every failure that the switch's diagnostics or a proof test detects to be reported, and a switch to be put out of operation after any malfunction. Once a failure found at a test is recorded, it can revise the interval at the site, the maker's analysis of the device and the pooled rates that the next design starts from.
For the incubator, the loop runs through those who service it and back to its maker. A yearly test that drives the protective channel past its limit, as Chapter 11 asks, finds the hidden failures that the test covers, and a check before each use can find others. In a report filed with FDA in 2022, the maker of a reusable skin-temperature probe describes an infant warmer found overheating at its check before use, with no patient involved. The device was not returned, so "a definitive root cause could not be determined": the failure was seen and its cause left unknown, as with Tank 912's gauge. The probe's maker is not the warmer's, so where a device carries another firm's sensor, the loop runs back to that firm as well.
Write each proof-test procedure to name the coverage the calculation assumed, the bypass it applies and the step that removes it. Give every bypass a time limit and a status shown in the equipment where possible, log it against PSLG's minimum controls, and remove or lock any bypass route that the procedure does not govern. Send every modification, software and configuration included, through management of change, and record each decision of replacement in kind with its reasons. Record every demand, test finding and bypass, compare the counts with the calculation's rates at a fixed period, and report failures to the maker, with the failed unit where it can be returned.
- A safety function's integrity figure is a prediction that rests on its rates, its test interval and coverage, the function being in place and the plant running as analyzed. In service each assumption is kept true by a practice or checked against a record.
- Any bypass, including the one that a proof test may need, sets the probability of failure on demand to one while it lasts, so more than about 54 hours of bypass a year take Chapter 11's overfill loop out of the SIL 2 band.
- At a Dutch refinery in 2017 a field switch left beside five-minute bypass timers held a furnace's low-flow interlock in bypass without limit, so a time limit built into equipment holds only where it governs every route to the bypass.
- Failures recorded in service are the only check on a design's rates: Tank 912's 14 stickings were not recorded on the defects log, while pooled records such as SINTEF's 2021 handbook carry such counts into the next design.