11 — Proof tests

Failures nobody sees.

+ The questionWhy does a hidden failure make the test interval part of the design?

A failure that waits for a demand

The independent high-level switch on Tank 912 at Buncefield was installed without the padlock that held its test lever in the operating position, and after its periodic tests the lever was left unsecured, either in the position that disabled the switch or free to fall into it. Both possibilities remain open in the 2011 report of the Competent Authority, the regulators who investigated the explosion. Either way the switch could not act, and no sign of that appeared until the night the opening describes.

A switch that cannot act looks the same as one that can. Its failure belongs to the dangerous undetected class of Chapter 2: it removes the protection, raises no alarm, and shows only when a real demand or a test finds it. For a function that is seldom called on, a demand reveals the failure only when the protection is already needed, so the test is the only way to find the failure in time.

High-level switches and other two-state detectors "may be inactive for long periods and may develop unrevealed faults" that "cause the system to fail to danger", in the words of the Process Safety Leadership Group, or PSLG. The group brought together the Health and Safety Executive, the environment agencies and the industry, and it issued its guidance for fuel storage sites in 2009. The remedy that the guidance requires is the proof test, a periodic test that reveals such failures, exercises the system and shows that it functions as intended. A proof test is carried out at intervals, and it aims at the dangerous failures that a system's own automatic checks cannot find (Chapter 12).

Hidden failures pile up between tests

How often to test follows from how a hidden failure arrives. Chapter 10 treated a part's failure rate as constant over its useful life: in every hour the chance of a dangerous undetected failure is the same small number, λDU. Nothing reveals such a failure when it happens, so the hourly chances add up. Straight after a test that has shown the channel working, the probability that the channel has failed since is zero. A year later it is about the hourly rate multiplied by the hours in a year, and it goes on climbing, close to a straight line, until the next test.

If the test reveals every dangerous failure, and a failed channel is repaired to as good as new, the probability drops back to zero and the climb begins again. With tests at a fixed interval, the climb and the drop trace a sawtooth whose teeth all have the same height, because each interval starts from zero and climbs at the same rate. That height is the probability that the channel has failed just before a test.

A demand can arrive at any moment, so for a function in low-demand mode the integrity level of Chapter 8 is judged on the average over the interval, not at the tip of a tooth. That average is the average probability of failure on demand, or PFDavg: the chance, averaged over time, that the function has failed dangerously and would not answer a demand. The average of a straight climb from zero is half its peak. For one channel, therefore, PFDavg ≈ λDU·T/2, where T is the proof-test interval, the time from one test to the next. Chapter 13 extends the formula to channels that back each other up.

23 — A hidden failure between proof tests
0 2 4 6 8 10 IN 10,000 PERFECT TEST, ONCE A YEAR AVERAGE 3.1 6.2 JUST BEFORE A TEST PROOF TEST average = half the peak 0 2 4 6 8 10 IN 10,000 95 % COVERAGE, MISSION TIME 10 YEARS MISSED BY THE TEST, NEVER RESET AVERAGE 4.5 0 1 2 3 4 5 6 7 8 9 10 YEARS IN SERVICE Rate: an assessor's analysis of one transmitter, made for its maker, used as a stand-in. Computed, not measured.
Dangerous failureDiagnosticsSafety functionFocal detail
Plate 23 — With a perfect yearly test the probability returns to zero at every test, and its average is half the peak, about 3.1 in 10,000 for a rate of 71 FIT. With 95 % coverage the 5 % the test misses is never reset, and the average over 10 years rises to about 4.5 in 10,000.

The formula is a shortcut, and it rests on four conditions. First, dangerous undetected failures dominate, so other failures and the time spent out of service can be neglected. Second, the rate is constant. Third, each test reveals every dangerous failure, after which the channel is repaired to as good as new. Last, the product of rate and interval stays small, because the straight climb is only the start of a curve that bends over toward certainty, so the shortcut applies to a system with a very low failure rate. The fuller formula of IEC 61508-6 Annex B adds back the two terms that the first condition neglects: the repair time, and the dangerous failures that the channel's own diagnostics detect. Without those two terms, the fuller formula reduces to the shortcut.

Solved example: the incubator's protective sensor, tested once a year

The protective channel of Chapter 4's incubator needs a sensor rate per hour, and the makers of its parts state reliability in other units (Chapter 10). The example therefore uses a stand-in for the incubator's sensor: the industrial temperature transmitter of Chapter 10, whose resistance-thermometer input has a λDU of 71 FIT, or 71 failures in 10⁹ hours, at an average temperature of 40 °C. The rate comes from a 2016 report in which the assessor exida, a certification and consulting company, analyzed the transmitter for its maker, PR electronics. The rate is calculated, not counted in service. The interval is one year: "most manufacturers recommend a minimum inspection frequency of once per year" for incubators, according to a 2019 white paper by Solecki of Fluke Biomedical, a maker of incubator test equipment. Over a year of 8,760 hours the probability climbs to 71 × 8,760 ÷ 10⁹, about 6.2 in 10,000. Its average is half of that, about 3.1 in 10,000, or 1 in 3,200. The result is a probability and has no unit: a demand at a random moment finds the channel failed about once in 3,200 times. That figure falls in Chapter 8's SIL 3 band for low demand. It covers one sensor channel only, since the comparison and the cutout add their own shares. The figure also assumes that the yearly test drives the protective channel itself, which a routine performance check does not, as the section on coverage shows. Tested every five years, the same channel averages about 1.6 in 1,000, in the SIL 2 band.

The proof-test interval is therefore a design quantity in its own right, chosen with the same care as the parts. The average is proportional to the interval as it is to the rate, so, with a perfect test, halving the interval halves the average, and a sensor with twice the rate meets the same average if it is tested twice as often.

The interval sets the band

The same arithmetic applies to a whole overfill loop in a worked example that PSLG gives in an annex. The loop has one level transmitter, one logic solver and one valve, tested once a year by "a full, perfect proof test". Its average is the sum of its parts: about 3.0 in 1,000 for the transmitter, about 0.7 in 1,000 for the logic solver, whose value PSLG fixes, and far less for the valve. In all, the loop averages about 3.8 in 1,000. PSLG itself states that the annex's "assumptions and failure rate data" are "fictitious" and that they are there "to demonstrate the use of the example calculation method". The loop therefore describes no real tank, Tank 912 included.

PSLG plots the loop's average against the proof-test interval, over the integrity bands. The curve starts near 1 in 1,000, just above the logic solver's fixed share, which is a floor that no amount of testing lowers. It passes about 3.8 in 1,000 at one year, inside the SIL 2 band, and reaches the boundary between SIL 2 and SIL 1, at 1 in 100, at about three years. At 10 years it ends near 3 in 100. Chapter 13 takes up the example's second loop on the same plot, with the transmitter and valve duplicated, and the rule that a design must satisfy architectural constraints as well as its PFDavg target.

24 — The proof-test interval decides the band
SIL 3 SIL 2 SIL 1 low-demand bands 1 in 10,000 1 in 1,000 1 in 100 1 in 10 0 1 2 3 4 5 6 7 8 9 10 PROOF-TEST INTERVAL, YEARS AVERAGE PROBABILITY OF FAILURE ON DEMAND 1 YEAR: 3.1 IN 10,000 ONE SENSOR CHANNEL, 71 FIT PSLG'S EXAMPLE LOOP (VALUES FICTITIOUS) about three years: the loop leaves the SIL 2 band PSLG's example loop: approximate readings of PSLG 2009, Appendix 4, Annex 3, Figure 39; PSLG calls the values fictitious. One sensor channel: computed from an assessor's analysis of one transmitter, made for its maker.
Safety functionFocal detail
Plate 24 — The average grows with the interval, so the interval decides the band. PSLG's example loop meets the SIL 2 band when tested yearly and leaves it at about three years, and one sensor channel at 71 FIT crosses from the SIL 3 band into SIL 2 at about the same interval. The loop never falls below about 0.7 in 1,000, its logic solver's fixed share, which testing does not reduce.

The interval is set twice under PSLG's guidance: at design, from the calculation of the probability of failure on demand, and again in service, where it is assessed and amended periodically from real operating data. That second step needs records: test results with the faults found and the repairs made, every demand and how the system performed on it, and, in particular, the failures that proof tests reveal. Tests that find failures more often than the calculation expected point to a rate higher than the calculation assumed, and so to an interval that is too long.

A test that finds only some failures

The shortcut assumes a perfect test, as PSLG's loop does, but PSLG's rules for real tests carry qualifiers. A proof test should run end to end, from the detector at the liquid surface to the final element, so far as is reasonably practicable, and should cover all dangerous failure modes where practicable. A test counts as full only if it trips the final element, the isolation valve or the pump. The sensor should be operated by the liquid itself where practicable; otherwise a simulated test may be acceptable, provided it can be shown that nothing would stop the liquid from operating the sensor at a genuine high level. A test cannot find a failure in what it does not exercise.

The automatic diagnostics miss some dangerous failures, and the share of those that a proof test reveals is its proof-test coverage; a perfect test has 100 %. Failures outside the coverage survive every test. They accumulate until the equipment is overhauled or replaced. The period over which the equipment is expected to run without such an overhaul is its mission time.

With coverage below 100 %, the probability has two parts, besides a small term for detected failures. The covered share resets with every test and averages half its peak over the test interval. The uncovered share never resets and averages half its peak over the whole mission time. A mission time spans many test intervals, so that share can be large even when the coverage is high.

The same sensor, tested once a year with 95 % coverage

The mission time here is 10 years, or 87,600 hours. With 95 % coverage the covered share averages 0.95 × 71 × 8,760 ÷ 10⁹ ÷ 2, about 2.95 in 10,000, and the uncovered share averages 0.05 × 71 × 87,600 ÷ 10⁹ ÷ 2, about 1.55 in 10,000. Together they make about 4.5 in 10,000. That is within 1 % of the 4.55 in 10,000 that exida computes for the same case with its own software, in its analysis of the transmitter. The 5 % of failures that the test misses raise the average from about 3.1 to about 4.5 in 10,000, by almost half.

For the incubator, coverage depends on what the yearly service test exercises. A service test that follows the Fluke Biomedical white paper checks the incubator's performance: its warm-up time, an overshoot of no more than 2 °C above the set temperature, and a temperature that varies by no more than 1 °C over an hour. Those criteria test the control loop. An incubator whose cutout has failed dangerously passes every one of them, because in normal operation the cutout does nothing. Only a test that drives the protective sensor past its limit and confirms that the heater goes off can find the hidden failures of the protective channel.

The share a test misses keeps growing between overhauls

Testing more often shrinks only the covered share. Halving the transmitter's interval to six months cuts the covered share from about 2.95 to about 1.48 in 10,000 and leaves the uncovered share untouched at about 1.55, so the total falls by about a third, not by half. As the interval shortens, the uncovered share comes to dominate, and only a test with higher coverage, or an earlier overhaul, brings it down. In a 2025 blog article, Gandy of exida reported one project in which the interval was cut to three months, a pace the end user could not sustain.

A test that can disable what it tests

The condition "as good as new" contains one more assumption: the test itself must leave the function working. Buncefield's switch shows what follows when a test does not. The switch sensed the tank's floating deck, a lid that rides on the petrol. When the deck rose to the switch, it lifted a suspended weight, the weight raised a magnet, and the magnet operated a reed switch inside, which started the alarm and the emergency shutdown. A test lever let the switch and its alarm circuit be operated without the deck moving. The lever had three positions, and the horizontal one was the normal operating position.

In the test as designed, the padlock was removed and the lever raised to its upper position, which operated the alarm circuit although the deck had not lifted the weight. The lever then went back to horizontal and the padlock was replaced. The lower position served switches fitted to detect a low level. On a switch working in high-level mode, lowering the lever "effectively disabled the switch", and the padlock "was therefore a vital safety feature", in the words of the Competent Authority's report. The report sets out what followed if the padlock was not replaced: "it was possible for the check lever to be left in the lower position or to fall naturally. In either case the switch would be disabled."

25 — Buncefield's high-level switch and its test lever
FLOATING DECK (LID) RISES WITH THE PETROL SUSPENDED WEIGHT MAGNET REED SWITCH DECK LIFTS WEIGHT → MAGNET RISES → REED SWITCH CHANGES STATE EMERGENCY SHUTDOWN AND ALARM RAISED: THE TEST OPERATES THE ALARM CIRCUIT WITHOUT THE DECK HORIZONTAL: NORMAL OPERATION PADLOCK: NEVER FITTED ON TANK 912 LOWERED: SWITCH DISABLED IN HIGH-LEVEL MODE after the periodic tests: left here, or free to fall here After Buncefield, the maker added a pin that stops the lever going below horizontal. Schematic, from the Competent Authority's report (2011, Appendix 1); not to scale.
Basic controlDangerous failureDiagnosticsSafety functionFocal detail
Plate 25 — The test raised the lever and was meant to end with it horizontal under a padlock. On Tank 912 the padlock was never fitted, so after the periodic tests the lever was left in the lowered position that disabled the switch, or free to fall into it.

On Tank 912 the padlock was never fitted. TAV Engineering Ltd designed, manufactured and supplied the switch. Motherwell Control Systems 2003 Ltd, the installer and maintenance contractor, ordered it from TAV and fitted it on 1 July 2004 in place of the tank's earlier switch. The switch "was installed without the padlock because it seems that Motherwell staff thought it was for security 'anti-tamper' purposes only". The switch was periodically tested, and none of the depot's staff knew that the padlock had to be replaced to hold the lever in place. For the function Tank 912 needed, the lower position served no useful purpose. It was a disabled state built into the switch, and the report judges it a risk that was unnecessary to run.

None of those tests met the condition that the shortcut rests on, that a test leaves the channel as good as new. Where the lever was left in the lower position, the switch would fail any demand until someone moved the lever: its probability of failure on demand was one, and no average over the interval applied. Where the lever was left free to fall, the test had added a failure of its own. A lever not returned and locked after a test can leave such a switch "inoperative in normal operating mode", even though the switch "gives the appearance of functioning normally when tested". The Health and Safety Executive gave that warning to operators of fuel storage sites in a safety alert first issued in July 2006 and amended in June 2010.

The investigators found that when the switch was replaced, no management-of-change process asked what the new switch would change in procedures, testing among them, although the depot's safety report required one for critical equipment. The test itself is a source of human failure. PSLG asks that procedures and competence arrangements rest on "adequate consideration of human failure potential" in inspection, maintenance and testing.

After Buncefield, TAV added a pin that stopped the lever moving below the horizontal, so a switch fitted with the pin cannot be left in the position that disables it. The padlock guarded that position; the pin makes it unreachable. A procedure depends on someone following it at the end of every test, and the pin does not. Chapter 20 makes the same comparison, between a procedure and a limit built into the equipment, for bypasses.

Make the interval and the test part of the design

Set the proof-test interval from the PFDavg calculation. Write the interval, with the coverage the calculation assumed, into the safety requirements specification (Chapter 17) and the service documents, so that the service engineer follows the interval the calculation used. For a device such as the incubator, make the yearly test exercise the protective channel end to end: its own sensor driven past its limit, its comparison, and the cutout opening the heater circuit. Record every failure a test finds, and revise the rate and the interval from those records. Remove any test position that disables the function, or make it impossible to return the device to service in that state.

+ What this chapter established
  • A dangerous undetected failure gives no sign, so the probability that a channel has failed climbs from the last test that showed it working until a proof test, or a demand, finds the failure.
  • Under the shortcut's four conditions, among them a perfect test and a small product of rate and interval, one channel's PFDavg ≈ λDU·T/2, half the peak. The average is proportional to the interval as it is to the rate: one sensor channel at 71 FIT, tested once a year, averages about 3.1 in 10,000.
  • Failures that a test cannot reveal accumulate over the mission time, so testing more often shrinks only the share that the test covers.
  • A test can disable what it tests. Buncefield's switch was never fitted with its padlock, and after its periodic tests its lever was left in the disabled position or free to fall into it.