23 — Test-method validation

A test that measures what it claims.

+ The questionWhat evidence shows that a test method gives the right answer every time it is run?

A test can agree with a wrong reference

The mirror of the opening story agreed perfectly with the one instrument that tested it, and that agreement was all the evidence there was. A production pressure test can fail in the same way, because each of its results is the monitor's reading minus the reference's. If the station's reference manometer read too high, a monitor that read too high by the same amount would show no error, and the station would pass it and record it as right. In Chapter 22 the engineer measured how much the station scatters when technicians repeat a test. The engineer now needs a wider answer: whether the whole method, from the fixture to the decision, gives the right answer each time a technician runs it, and what evidence can show that it does.

A test method is the complete procedure by which a maker decides whether a product meets a requirement: the equipment and its settings, the steps and their conditions, the number of samples, the calculation and the acceptance criteria. For the monitor's pressure test it covers the vessel and its connections, the reference manometer, the service mode and the test points. It also covers the time the technician waits at each point, the order of the two readings and the decision rule of Chapter 13. Test-method validation is the evidence that this procedure, run as written, gives results that are right and that repeat. A test method is a process whose product is a result, so the definition of process validation applies to it: establishing, by objective evidence, that a process consistently produces a result that meets its predetermined requirements, as the Global Harmonization Task Force, GHTF, defines it in its guidance of 2004 (Chapter 22).

Whether a process needs validation depends on whether its output can be checked afterward. GHTF sets validation beside verification, which it defines as "confirmation by examination and provision of objective evidence that the specified requirements have been fulfilled". Here verification has its design-and-process sense and applies to a product, not, as in Chapter 14, to a measuring instrument. Where a product can be checked after it is made, GHTF asks makers to consider "whether or not verification alone is sufficient to eliminate unacceptable risk and is a cost effective solution". A test's result cannot be checked in this way. The maker could confirm a pass only by testing the monitor again on a second, better station, and a maker who did that for every monitor would not need the first station. The maker therefore proves the method once, in advance, and then trusts each result that the proven method produces.

What FDA asks of a bench test

FDA asks a maker that submits bench tests to show how each test was planned as well as what it found, in its guidance of 20 December 2019 on non-clinical bench performance testing in premarket submissions. FDA writes that the test report should describe "the acceptance criteria that you prospectively identified", with "a clinical/scientific/engineering justification for these criteria, when applicable". FDA recommends "a scientific rationale to support the number of samples tested", and asks for "the data collected for all test samples (including outlying and anomalous results)". Where a test follows a standard, FDA asks for "a full citation of the standard, including the version", and for any departure from it. The guidance does not require test-method validation under that name, but each of these requests assumes a method fixed before the data and shown to work.

ISO 13485:2016, the quality-system standard for device makers, requires the method itself to be written down, and FDA's QMSR has incorporated the standard by reference since 2 February 2026 (Chapter 17). For the standard's clause on design verification, Tartal of FDA gives this summary in FDA's training slides on design and development: "The verification plans, including methods, acceptance criteria, and statistical techniques must be documented". The engineer therefore writes the method into the plan, with its acceptance criteria, before any monitor is tested.

FDA has cited the absence of such evidence in enforcement. On 27 June 2025 FDA sent a warning letter to an Italian maker of radio-frequency, laser and infrared heating devices. FDA wrote that the firm had "not established process validation and/or test method validation procedures" for the system that calibrated its devices' output. The firm's acceptance records listed results "without identifying the test equipment used (e.g., laser power meter)", and "quantitative acceptance points were only recorded as two check marks on a separate uncontrolled document". FDA issued the letter under the older Quality System Regulation, before the QMSR took effect, and a warning letter states FDA's allegations rather than a court's finding. Each of the three faults leaves a reviewer unable to tell whether the test could have found an error. Without validation nothing shows that the method works, an unnamed instrument cannot be linked to its calibration, and a check mark keeps no value to compare with the criterion.

56 — The pressure test as a method, element by element
hand pump with release valve T-pieces and hoses no longer than 600 mm 500 ml ± 25 ml SPECIFICITY leak no more than 6 mmHg a minute (OIML R 149-1) mmHg REFERENCE MANOMETER ±0.8 mmHg ACCURACY calibration, Ch 14; ratio, Ch 12 SERVICE 150 mmHg MONITOR IN SERVICE MODE pass fail decision rule (Ch 13) PRECISION AND OPERATOR INDEPENDENCE gauge study, Ch 22 order and timing of the two readings 0 top of the scale RANGE steps no larger than 50 mmHg, from zero to the top of the scale room temperature ROBUSTNESS a warmer room, a slightly different vessel Elements after OIML R 149-2:2020; characteristics after ICH Q2(R2) (written for medicines) and GHTF SG3 (2004). Schematic.
The quantity being measuredReferences and standardsNoise and errorLimits and decisionsReadingFocal detail
Plate 56 — Every element of the pressure test carries one of the characteristics a validation must show. The timing of the two readings belongs to none of the instruments, and a validated method fixes it.

What a validated test must show

A clear published list of what a validated test must show comes from medicines rather than devices. ICH, the international council that harmonizes technical requirements for medicines, set out the list in its guideline Q2(R2), which FDA issued as guidance in March 2024. Q2(R2) covers the analytical procedures used to test medicines, and the objective of their validation is "to demonstrate that the analytical procedure is fit for the intended purpose". ICH names the characteristics: specificity, range, accuracy and precision, with precision split into repeatability and intermediate precision. It defines accuracy as the "closeness of agreement" with a reference value and robustness as the "capacity to meet the expected performance criteria during normal use", and it places the study of robustness in the development phase.

ICH also states how many results each characteristic typically needs. For repeatability it asks for nine determinations over the range, or "a minimum of six determinations at 100 percent of the test concentration". For accuracy it gives, as one design, three concentrations with three replicates each. An engineer who reads the guideline for a pressure station puts test points where a drug laboratory puts concentrations. Six repeats at 150 mmHg, or three repeats at each of three pressures, would then be the minimum for the station's repeatability, read across from a text that ICH wrote for medicines.

Each characteristic has a counterpart in the pressure test. Range is the span of the test points. Accuracy is the agreement of the station's result with the monitor's true error, and it rests on the reference manometer's calibration, the subject of Chapter 14, and on the test uncertainty ratio of Chapter 12. Precision, in the sense of Chapter 2, is the station's repeatability and its reproducibility across days and technicians, which the gauge study of Chapter 22 measures. Operator independence, the property that the result does not change with who runs the test, matters because a monitor's verdict must not depend on the technician. ICH covers it under intermediate precision, whose typical variations include "different days, environmental conditions, analysts, and equipment", and a gauge R&R study, which GHTF's guidance names, measures it as reproducibility (Chapter 22).

Specificity is the method's response to the monitor's error alone, and not to a leak, a moving pressure or a change of temperature. Robustness is the method's capacity to keep meeting its criteria despite the small changes that daily use brings, such as a slightly different vessel, a longer wait or a warmer room.

The pressure test, element by element

A maker can validate its own cuff-pressure test against the procedure that OIML publishes for that test in its recommendation R 149-2 of 2020. In that procedure the tester replaces the cuff with a rigid metal vessel of 500 ml ± 25 ml and connects the monitor and a reference manometer through T-pieces and hoses no longer than 600 mm. The reference manometer's maximum permissible error is ±0.8 mmHg. The tester then raises the pressure from zero to the top of the scale in steps no larger than 50 mmHg, which sets the method's range, and takes the monitor's reading minus the reference's as the result. A maker's validation shows that its own station meets or improves on each of those elements, and that nothing else in the station moves the result.

The vessel must hold its air, because a leak lets the pressure fall while the technician reads. OIML limits an automated monitor's air leakage to 6 mmHg a minute in R 149-1. In its test procedure, R 149-2, the tester measures the leak at no fewer than three pressures, waits at least 60 s, and then measures the fall over 5 minutes. Even within OIML's limit the pressure moves during a reading. If the monitor and the reference are read at different moments, they see different pressures, and the difference enters the result as an error that belongs to neither instrument.

57 — What a gap between two readings costs
142 144 146 148 150 140 0 1 2 3 4 5 0 1 2 3 4 5 STATIC HOLD leak at OIML's limit COMPARISON DURING DEFLATION at 3 mmHg a second PRESSURE, mmHg TIME AFTER THE FIRST READING, SECONDS reference read reference read 4.6 s reference manometer's standard uncertainty, 0.46 mmHg (0.8 ÷ 1.732) leak 0.1 mmHg a second (6 mmHg a minute) the technician has seconds to take both readings 3 mmHg a second 2 mmHg a second dotted box: first 0.3 s, magnified 0 0.1 0.2 0.3 s 0.23 s 0.15 s Sources: OIML R 149-1:2020 (leak limit) and R 149-2:2020 (reference limit); deflation rates as published (Chapter 7).
The quantity being measuredReferences and standardsUncertaintyFocal detail
Plate 57 — With the pressure held, a leak at OIML's limit needs 4.6 s to move the pressure by the reference's standard uncertainty. During a deflation the same error arrives in 0.15 s.

The pressure must also hold still, because the monitor itself moves it quickly. During a measurement a monitor deflates the cuff at about 2 to 3 mmHg a second, the published rates of Chapter 7. In OIML's static test the station holds each pressure steady, so the only movement left during a reading is the leak. If a station compared the two instruments during a deflation at 3 mmHg a second, each second of gap between the readings would add 3 mmHg of error, thirty times the 0.1 mmHg a second of a leak at OIML's limit. The test's specificity therefore depends on the hold and on the order and timing of the two readings.

Solved example: how far a leak and a gap between readings move the result

The reference manometer's limit of ±0.8 mmHg gives it a standard uncertainty of 0.8 ÷ 1.732 = 0.46 mmHg, the limit divided by the square root of 3 (Chapter 11). The question is how long a gap between the two readings it takes for the pressure's movement to add an error that large.

  • Static hold with a leak at OIML's limit: 6 mmHg a minute is 6 ÷ 60 = 0.1 mmHg a second, and 0.46 ÷ 0.1 = 4.6 s.
  • Comparison during deflation at 3 mmHg a second: 0.46 ÷ 3 = 0.15 s. At 2 mmHg a second, 0.46 ÷ 2 = 0.23 s.
  • The leak test: over OIML's 5 minutes, a leak at the limit lets the pressure fall 6 × 5 = 30 mmHg. Read on a display that steps in 1 mmHg, the start and the end are each rounded by up to half a step, 0.5 mmHg, so the fall is known to within 0.5 + 0.5 = 1 mmHg. Over 5 minutes that is 1 ÷ 5 = 0.2 mmHg a minute, and 0.2 ÷ 6 is 3.3 % of the limit. Over 1 minute it would be 1 mmHg a minute, and 1 ÷ 6 is 17 % of the limit.

The static hold gives the technician seconds to take both readings, while a comparison during deflation would allow 0.15 to 0.23 s, about a fifth of a second. The five-minute window lets a display with a 1 mmHg step resolve the leak to 3.3 % of the limit. A validation turns these numbers into the method's own limits: the longest gap allowed between the two readings, the shortest hold and the largest leak the fixture may add.

A method proves only what it tests

A test method proves only what it exercises, and a simulator test shows that limit plainly. A simulator replays the same oscillations to the monitor each time, so a monitor that returns the same values shows that its algorithm repeats. The simulator's oscillations do not come from a person's artery, however, so a repeatable answer on the simulator does not show that the answer is right, and Chapter 24 describes the study on people that does.

The simulator must itself repeat. Under the technical specification ISO TS 81060-5, which FDA recognized in July 2020, the simulators used to test automated monitors must meet requirements for repeatability and reproducibility, for the oscillometric method only. Fluke Biomedical's ProSim 8 simulator "generates a very repeatable signal within ± 2 mmHg", in its maker's words, a figure for the simulated oscillations rather than for static pressure.

Automating the reading moves part of the validation into software. Kumar and four colleagues at CSIR-NPL, India's national metrology institute, describe a rig whose software "calibrates 20 BP measuring instruments together", in a dataset they published in 2023. A camera reads each monitor's display by image processing, so code, not a technician, reads each number. Whoever runs such a rig must therefore show that the code reads every digit correctly under the rig's own conditions, the validation of software for its intended use that Chapter 17 described.

A station bought as validated still needs the maker's own validation

A station's supplier can show that the station works under the supplier's conditions. "It is usually insufficient to rely solely upon the validation results of the equipment supplier", in GHTF's words, and it is "important to ensure test methods replicate actual use conditions". The maker's own fixture, hoses, technicians, room and monitors are part of the method, so the maker repeats the parts of the validation that its own conditions can change.

Validating a production pressure test
  • Write the method before the data: the fixture, the vessel, the reference and its certificate, the test points, the holds, the order of the two readings, the decision rule, and the acceptance criteria for the validation itself.
  • Show accuracy with the reference's calibration and a test uncertainty ratio at each point, and precision with the gauge study of Chapter 22.
  • Test robustness on purpose: vary the hold, the vessel within its tolerance and the room temperature, and show that the results stay within the criterion.
  • Measure the fixture's own leak, and set the longest gap allowed between the two readings from it.
  • Record the identity and calibration status of the equipment behind each result, and keep every quantitative result, outliers included.
  • Validate any software that reads, computes or decides, and repeat the supplier's validation under the maker's own conditions.
+ What this chapter established
  • A test method is the whole procedure from fixture to decision, and its validation is evidence, fixed in advance, that the procedure run as written gives results that are right and repeat.
  • FDA asks for acceptance criteria identified in advance and for every result, ISO 13485, as FDA summarizes it, requires documented methods and criteria, and FDA has cited a maker for a test that lacked such validation.
  • ICH's list for medicines, with accuracy, precision, range, specificity and robustness, maps onto the pressure test, and the gauge study tests operator independence by measuring the technicians' share of precision.
  • A static hold lets the two readings lie about 4.6 s apart before a leak at OIML's limit adds an error as large as the reference's standard uncertainty, against about 0.15 s during a deflation at 3 mmHg a second, and a simulator test shows that the monitor's algorithm repeats, not that its answer is right.
Created with Claude (Anthropic).
Educational reference material, not engineering, regulatory or clinical advice. Product and company names referenced are the property of their respective owners.